Nebraska Medicine moved forward with a long-overdue renovation of the Orange Parking Structure (Lot 01) and the hospital front entrance. The renovation included a three-level parking structure, a drive-up patient and valet entrance; a helipad; doctor parking at grade level; and a waterproofed plaza system.

Before the renovation could start, a new access entrance to the parking deck had to be constructed, and the flow of traffic re-mapped. While the plaza system was replaced at the main entry, a temporary patient drop-off canopy was erected and the side emergency door was used as the entry. To further accommodate the needs of patients and staff, a significant amount of the work was performed during off-business hours, and major demolition of the parking garage occurred at specified times.

The scope of work included replacement of expansion joints, post-tension cable repairs, masonry repairs, application of traffic coatings, application of penetrating sealer, and painting of interior ceiling surfaces.