Kiewit subsidiary, TIC – The Industrial Company, is providing engineering, procurement and construction services for a 705 MW combined-cycle gas turbine power plant. The team is overseeing the design of the power island equipment, engineering the foundations and self-performing the installation, start-up and commissioning of key components, including a GE 7HA.03 combustion turbine, A650 steam turbine, GE/Alstom three-pressure heat recovery steam generator and air-cooled condenser.