Orlando South Terminal Intermodal Facility Orlando South Terminal Intermodal Facility Orlando South Terminal Intermodal Facility Orlando South Terminal Intermodal Facility Orlando South Terminal Intermodal Facility Orlando South Terminal Intermodal Facility Orlando South Terminal Intermodal Facility Orlando South Terminal Intermodal Facility Orlando South Terminal Intermodal Facility

Orlando South Terminal Intermodal Facility

Orlando , Florida

The 200,000 SF Intermodal Terminal Facility (ITF) is a four-story building providing rail passengers easy access to and from the All Aboard Florida rail system, the airport, and a five-story parking garage.

The 50,000 SF passenger drop-off lobby is an entryway connecting the ITF to public transportation. The 1,400 LF Elevated Rail Bridge Viaduct brings the All Aboard Florida trains into the ITF to deliver and pick up passengers on a raised platform located within the facility.

The Intermodal Terminal Facility encompasses seven GMPs with a total of 60 subcontracts. Daily coordination is required with adjacent CMAR and DBOM projects being built concurrently and utilizing shared site access areas.

The South Terminal Complex is one of the first airport terminals to attempt a LEED Version 4 certification for sustainability.