East Link Extension: E360 Bellevue to Redmond
The joint venture project is the final segment in the East Link Extension that will take light rail from downtown Seattle to Redmond. The alignment includes 1.8 miles of double-track light rail transit infrastructure on elevated and at-grade guideway through retained cuts and fills. The work also includes two at-grade stations – Overlake Village near … Continue reading East Link Extension: E360 Bellevue to Redmond
Copy and paste this URL into your WordPress site to embed
Copy and paste this code into your site to embed