Kiewit Western Co. completed this $7.6 million project to replace a 34-yr.-old air traffic control tower one month ahead of schedule. At an elevation of approximately 7,000 ft., crews constructed a new control tower, base building, emergency generator building and fuel containment area.
Kiewit Pacific Co., a subsidiary of Kiewit Corporation, completed the Amtrak Oakland Maintenance Facility construction in 2004. The $53 million project involved site work, construction of a fuel area and three buildings – a 52,439-square-foot maintenance shop, a service and inspection area and a train washer facility that has a 300-foot-long rinse slab and load test enclosure.
As a result of a Value Engineering initiative, Kiewit Construction Company was named Construction Manager and General Contractor for this $19.5 million project. Work on Amtrak's Pacific Northwest Maintenance Facility involved additional measures to keep some 67,000 Seattle Seahawks fans safe while they trekked across the project's location on their way to Seahawks Stadium.
This $23 million project involved redeveloping an existing pier substructure and constructing a new terminal building for the Vancouver Port Corporation. Completed in February 1995, this was the owner's first formally partnered project.
This $16.7 million design-build project involves construction of a bulk fuel storage facility, a 20-person dormitory, and vehicle and range maintenance bays. The 2,800-sq.-meter complex has its own water, septic, power generation, communications, and fire protection systems.
This $28.4 million project to construct three new buildings at Hickman Air Force Base included a flight simulator facility, squadron operations facility and consolidated maintenance complex. The 14-month project included extensive environmental conservation measures to protect land, water, wildlife and air resources.