Jobs Done Well

Benicia-Martinez Bridge – Benicia to Martinez, CA

The Pacific Structures District is a leader in heavy construction. Since 1985, we have specialized in building some of the most modern and technically challenging bridges in North America. In addition to our bridge work, we also construct projects related to:

  • Marine and port facilities
  • Highways and bridges
  • Dams and reservoirs
  • Hydro plants
  • Mass transit, light rail and heavy rail

Our work includes building 142 new bridges for the $1.3 billion design-build reconstruction of I-15 in Salt Lake City; constructing a concrete arch bridge spanning the 300-ft.-deep Crooked River Gorge in central Oregon; leading the construction of the world’s widest cable-stayed bridge over the Charles River in Boston; installing a 12-ft.-dia. shaft 240 ft. beneath Lake Mead in Las Vegas; placing over 200,000 cu. yd. of concrete for the Bonneville Lock and Dam in Oregon; and constructing the twin balanced cantilever Skyway Segment of the San Francisco-Oakland Bay Bridge in California.

Skyway Segment – San Francisco-Oakland Bay Bridge

With extensive resources that include talented people, in-depth market knowledge, state-of-the-art equipment and unparalleled experience, the Pacific Structures District is uniquely qualified to handle any size project.

The Pacific Structures District conducts its operations primarily through Kiewit Pacific Co., a subsidiary of Kiewit Corporation.

Vancouver
Kiewit Pacific Co.
2200 Columbia House Blvd.
Vancouver, WA 98661
(360) 693-1478
(360) 693-5582 fax